Pile Construction Supervision

The quality of executed piles depends on continuous control and supervision:

Construction site overview and monitoring.

Supervision – general and geotechnical supervision.

    Monitoring all stages of execution: drilling, cleaning, base analysis, reinforcement placement, concreting, installation of instruments.

      Control of fresh concrete, groundwater level, verticality, borehole shape, and drilling depth.

        Real-time supervision of works, with reporting to the investor.

          Participation in technical acceptance and preparation of documentation for finalization of pile construction.

            Quality Management System (QMS) in pile supervision: protocols, checklists, work log, verification of design assumptions, and interventions.